1 / 5
| Model NO. | OM-AD016 | Bandwidth | 100Mbps |
| Ports | 5-8 | Transfer Rate | USB 3.0/2.0 & Type-C |
| Compatible Network | Gigabit Ethernet | Material | Aluminum Alloy |
| Input | USB Type C Male | Output | VGA+HDMI+USB3.0+PD+Audio |
| HDMI Resolution | 4K@30Hz | VGA Resolution | 1080P@60Hz |
| USB Speed | 5Gbps for Data Syncing | USB-C Power | PD 3.0 100W |
| Warranty | 12 Months | Certification | CE, RoHs, FCC |
📦 Package Size: 18.00cm * 9.00cm * 2.00cm
⚖️ Package Gross Weight: 0.085kg
🏭 Production Capacity: 500,000 PCS/Year
| Product Name | 5-in-1 Type-C Docking Station for Dual Monitors: 4K HDMI/VGA, 100W Charging, 5Gbps |
| Interface | Type-C & USB 3.0/2.0 |
| Function | Charging + Data Transfer + Video Output |
| Color | Space Grey |
| Size | 80*50*15 mm |








